
wet niche pool bond junction box
Box mounted well above the 8" of the highest water level. Run your load from your switch to that junction box and make your splice? thanks for any insight. Trying to understand the purpose
Related Video Reference
This video was associated with the source search result. Verify technical details against current product documentation and project requirements.
This reference is intended for preliminary ODN and passive infrastructure research. Topology, split ratio, box or cabinet capacity, closure rating, cable type, test limits and applicable standards must be verified for the specific project.