GESTIONVAL ODNODN INFRASTRUCTURE Technical Inquiry

The electrical box is in the niche

WET NICHE INSTALLATION MANUAL A licensed or certified electrician must install the electrical system to meet or exceed those requirements before the light.

The electrical box is in the niche

wet niche pool bond junction box

Box mounted well above the 8" of the highest water level. Run your load from your switch to that junction box and make your splice? thanks for any insight. Trying to understand the purpose

Related Video Reference

This video was associated with the source search result. Verify technical details against current product documentation and project requirements.

Technical note

This reference is intended for preliminary ODN and passive infrastructure research. Topology, split ratio, box or cabinet capacity, closure rating, cable type, test limits and applicable standards must be verified for the specific project.

Still Have a Technical Question?

Use the inquiry form to describe an ODN network, passive component or distribution box question.

Start an Inquiry